Renewals (Capex works)
- Ballast regulating and third rail ballast clearing
- Ballast shoulder replacement (improve drainage)
- Bearer replacement in S&C
- Cable Management – Move or lower cables
- Cables – Bury any that are exposed above ground
- Cables – Bury or relocated against theft
- Drainage – Cleaning and Emptying catch pits
- Drainage – Enhancement work
- Drainage – Lowering and re-raising of catch pits
- Excavation – In areas with buried cables or services
- Excavation – With the track in situ
- Re-ballasting – Confined areas*
- Re-ballasting – S&C and Plain Line
- Sleeper replacement in plain line and S&C
- Through shoulder drainage channels
- Track lowering – In confined areas*
- UTX excavation for cables, drainage, etc.
- Wet spot complete removal
*Confined areas – e.g. Tunnels, Platform areas, Level crossings, Under structures, Industrial loading docks, Stations